Today and yesterday and the day before I worked some more on the Neptune 16. The ladder rungs were sanded and got another coat of epoxy and then were roped up.. The rigging was set up again using new hardware from duckworks so I could get a full picture of the boat:
New clevis pins were used to hold the forestay and shrouds instead of the nuts and bolts that came with the boat. A small swivel block was used to set up the outhaul for the mains'l. This, the downhaul and an extension to the jib tack were set up using some 1/4" or 3/8" low stretch line that I had laying around from who knows where.
My messing-about-in-boats mentor, Paul, came up and gave me some suggestions and a hand putting in the backing plate. Taped on the lower gudgeon, drilled and used the screws and Paul to hold it in place while I measured, taped and drilled for the upper gudgeon. The backing plate turned out to be too thick as it was with the doubled 1/2" marine ply, so we shaved about 3/32" off of it, trimmed and rounded the bottom, and routered a round edge on the bottom to fit better (Paul's idea). I held it in place from the inside of the boat (got to crawl under the seat again), while Paul placed a couple of screws to hold it in place. Then we drilled the scupper hole, gudgeon bolt holes, and bilge drain plug hole.
I also tidied up the trailer wiring since it was put in kinda hectic-like :-)
The upper gudgeon was installed and I learned to place a nut on a bolt to hacksaw it down to size without mangling the threads. Made a bit of a mess with the silicone caulk. I caulked the lower gudgeon and 5 hours later Sarah screwed the lower gudgeon bolts while I held the wrench on the lock nuts from the inside (yes, I got to crawl under the seat. Again). I then caulked the scupper and drain plug fitting in place.
Looks like it's all gonna work out. Hopefully I can put it in the water with Paul on Sunday :-)
Wednesday, June 13, 2012
Sunday, June 10, 2012
Backing plate and rungs...
Spent about 3 hours today cleaning up the shop, making some rungs for a rope boarding ladder and making a new backing plate for the bilge drain, lower gudgeon, and cockpit scupper.
The original backing plate was rotted out and that's what I spent hours pulling the old floatation foam out of there to access and remove. It looked to be made of 3/4" plywood. I wanted to beef it up a little so the new one is made of 2 layers of 1/2" marine ply glued together and coated with epoxy mixed with cabosil. I also added about 1" to each side and the top of the backing plate to spread the force out over a wider area.
Pics to follow...
The original backing plate was rotted out and that's what I spent hours pulling the old floatation foam out of there to access and remove. It looked to be made of 3/4" plywood. I wanted to beef it up a little so the new one is made of 2 layers of 1/2" marine ply glued together and coated with epoxy mixed with cabosil. I also added about 1" to each side and the top of the backing plate to spread the force out over a wider area.
Pics to follow...
Tuesday, June 5, 2012
Work begins...
Have the day off, so I went to work on the Neptune 16
Removed the 2" lag bolt the guy had been using for a drain plug and drilled the hull out for a new one.
Removed the gudgeons. One was only held in loosely with no way of tightening the nuts on the inside of the transom. The other came off in my hand and was held in by a bolt with no nut and a self-tapping metal screw.

Removed the 1/2" scupper in preparation for a larger one to drain the cockpit faster.

Removed all the expanded floatation foam from under the aft end of the cockpit by crawling under the seats and hacking away at it with a small pry-bar. Nastiest job of the day, hands down! But, now I can access the interior of the transom to replace the rudder gudgeons, etc.



Fabricated a temporary mast crutch to transport the rig since the former one was held in place by the gudgeons.
Fabricated a temporary hatch to shed most of the rainwater and protect the interior and contents.
Placed a duckworks order including new gudgeons (was going to replace them with stronger ones anyway), some clevis pins, sail slugs, and a pulley for the mains'l outhaul.
Removed the 2" lag bolt the guy had been using for a drain plug and drilled the hull out for a new one.
Removed the gudgeons. One was only held in loosely with no way of tightening the nuts on the inside of the transom. The other came off in my hand and was held in by a bolt with no nut and a self-tapping metal screw.
Removed the 1/2" scupper in preparation for a larger one to drain the cockpit faster.
Removed all the expanded floatation foam from under the aft end of the cockpit by crawling under the seats and hacking away at it with a small pry-bar. Nastiest job of the day, hands down! But, now I can access the interior of the transom to replace the rudder gudgeons, etc.
Fabricated a temporary mast crutch to transport the rig since the former one was held in place by the gudgeons.
Fabricated a temporary hatch to shed most of the rainwater and protect the interior and contents.
Placed a duckworks order including new gudgeons (was going to replace them with stronger ones anyway), some clevis pins, sail slugs, and a pulley for the mains'l outhaul.